LogoDispatch
Operations Consultancy · Est. 2014

You don't have
an energy problem.
You have an
operations problem.

Marcus Hale · 22 years in-field · 14,800 MW of generation capacity overseen across pipeline, transmission, and renewable portfolios

Most consultancies hand you a report and leave. Dispatch stays until the control room runs the way it should — and guarantees it.

14,800 MWCapacity Overseen
37Facilities Transformed
100%Phase 4 Guarantee Rate
Engagement Model

The Dispatch Process

Four phases. No ambiguity. You see the deliverables before you sign, and you hold the guarantee at the end.

Phase 012–3 weeks on-site

Operational Assessment

We read every log, walk every corridor, and sit in every shift handoff.

Before we write a single recommendation, Dispatch spends two to three weeks embedded at your facility. We map your current-state workflows against your incident logs, your SCADA data, and your regulatory filings. The output is a Gap Analysis Matrix — every deviation between how the facility is supposed to run and how it actually runs, ranked by financial exposure.

Gap Analysis MatrixIncident Root Cause MapRegulatory Exposure RegisterShift Handoff Audit
Phase 023–4 weeks collaborative

Process Redesign

We don't hand you a document. We build the new process with your team.

Every redesigned workflow is co-authored with your operators, shift supervisors, and control room leads. We use swim-lane process maps to make responsibilities unambiguous, then validate each change against your DCS and SCADA configurations before anything goes live. No surprises during implementation.

Swim-Lane Process MapsSCADA Configuration ReviewOperator Training MatrixChange Management Runbook
Phase 034–8 weeks on-site

Embedded Implementation

We stand in the control room beside your team while the new process runs for the first time.

Implementation is where most consultancies disappear. Dispatch doesn't. Our engineers are on-site for every shift during the go-live window, troubleshooting in real time, adjusting the process where field reality diverges from the design. We don't leave until your operators own it.

Go-Live Shift CoverageReal-Time Process Adjustment LogOperator Certification Sign-OffIncident Response Drill
Phase 0490-day post-implementation

Performance Guarantee

If the metrics don't move, neither does our final invoice.

Every engagement ends with a 90-day performance window tied to the KPIs we agreed on at assessment: unplanned downtime hours, regulatory findings, mean time to restore, alarm fatigue index. If those numbers don't hit the targets, Dispatch returns at no additional cost until they do. That's not a clause. It's how we work.

KPI Baseline Report30/60/90-Day Performance ReviewsCorrective Action ProtocolFinal Certification Package
Primary Path

Request an Operations Assessment

Tell us about your facility. The pain point field is intentionally open — we read every response and respond within one business day.

Secondary Path

Not ready to talk yet?

Download our field guide: "The 6 Hidden Costs of Operational Drift". One page. No fluff. The six line items your finance team hasn't connected to ops performance yet.

The 6 Hidden Costs of Operational Drift

Dispatch Field Intelligence Series · 1 page · PDF

01Unscheduled Maintenance Cascade
02Regulatory Fine Accumulation
03Operator Cognitive Load Tax
04...and 3 more

No sales sequence. No automatic enrollment. Your email goes to Marcus directly. If we're not a fit, we'll tell you that in the first response.